Dairy Crest

The Project consisted of a £2.5 million two-story structure for the production of polythene bottles.

Enabling works included an access road for HGV vehicles and their trailer parking areas. The main contract consisted of the construction of traditional foundations, propped steel portal framework and composites concrete upper floors. The ground floor was formed as a fiber reinforced concrete ground bearing slab.

Composite Metal Floor Construction
Composite Metal Floor Construction
Showing upper level production area and mezzanine office floors. Composite steel and metal deck utilizing metal studs and mesh/fiber reinforced concrete.
Braced Portal Frame with raised loading dock area to the right.
Braced Portal Frame
Braced End Bay
Braced End Bay with future HGV entry adjacent.

Completed project photos

Back to Project Profile

 


Alan Hutton Associates, The Slaughterhouse, Farren Court,
The Street, Cowfold, West Sussex, RH13 8BP
Tel: 01403 864455 Fax: 01403 864402 E-mail: aha@alangh.globalnet.co.uk
Copyright © 2002 Alan Hutton Associates, All rights reserved. Site Design by SolveIT